Sunday, June 24, 2007
JACK came over yesterday
he was a BIG help. so were Leigh and Ian. anybody want some rubble? the slab under our shed ranged from 4"-12" thick and included: dry, powdery concrete mix, full-bag shaped pieces of mortar mix, bricks, core samples, all thread, fencing material, a metal rake head and a piston with con-rod still attached! sweet.
Subscribe to:
Post Comments (Atom)
1 comment:
damn that looks like it was hard work. i am sorry i missed the fun!
Post a Comment